top of page

Who Makes the UTS Registration? Consultant Authorisation

Your device has arrived, your buyer is ready, but the product does not appear in the Product Tracking System (ÜTS). What you are looking for at this point is not a lesson in regulation

Who Makes the UTS Registration? Consultant Authorisation

Who Makes the UTS Registration? Consultant Authorisation

Your device has arrived and your buyer is ready, but the product does not appear in the Product Tracking System. At this point you are not looking for a regulation lesson; you are looking for the answer to who will carry out the work.

The way we work at Medex Corporate Consultancy is as follows: you define a user of the "Medical Device Registration Officer" type for us from your own company page in UTS. We create the company, document and device records, fill in the mandatory fields, and carry out the "Approve" step on the application. The e-signature remains with your authorised signatory, and responsibility for the accuracy of the data entered into the system remains with your company.

This page describes the scope and limits of the service. You will see at the outset what we take over, what we do not take over, and exactly what we need from you. If you want to know how the process runs step by step, the procedural detail is in our UTS Registration Consultancy guide pages; this page describes the service itself.

UTS registration is not one transaction but three separate records

"Having UTS registration done" sounds like filling in a single form. The system does not work that way. Company registration, document registration and device registration run on separate screens, under separate rules and with separate number limits. Article 5 of the Guide governs company registration transactions, Article 39 governs document application transactions, and Article 40 governs medical device application transactions.

The order is not free either. The part of the Guide from Article 63 to Article 67 defines document business rules for each of the MDD, AIMDD, IVDD, MDR and IVDR frameworks, and the first paragraph of all five says the same thing. A document to be linked to a device must be in "Registered" status in UTS as a result of an application made under Article 39. Your document may exist in the system, but if its application has not been completed it will not be listed on the device screen.

There is a small sequence within the chain as well. Under sub-item (a) of paragraph 5 of Article 25 of the Guide, sub-item 3, the class of the relevant device must be selected on the registration screen before documents are selected. The system filters the selectable documents by device class.

  • Company registration: defines who will enter data for the system and who will sign.
  • Document registration: introduces certificates, declarations, instructions for use and similar documents into the system.
  • Device registration: records the product itself, together with the barcode, class, name, dimensions and images.

Engaging outside support without knowing which of these three links the file is stuck at usually means repeating the same error more quickly. The first job in the initial meeting is to identify which link your file has stopped at.

Scope of the service: the transactions we carry out

What we take over is the part from filling in the registration screens up to the "Approve" step of the application. This part carries the real workload of the file, and most rejection decisions arise from errors made here.

Notification creation and the "Approve" step are within the scope of the service

Article 39(11) of the Guide states in one sentence the rule for the "Approve" action on the document application summary screen: only users of the relevant company of the "Medical Device Registration Officer" type may carry out this action. The same rule applies on the device side; sub-item (f) of paragraph 5 of Article 40 and sub-item (c) of paragraph 6 repeat the same wording.

The authority you open for us is exactly this. The registration officer authority is sufficient to create the notification, select the documents, add products to the application and approve the application.

Mandatory field completion: for a device registration under the MDR, Article 27 of the Guide defines fields under eleven headings, from identifying information to storage conditions. We establish which of these fields is mandatory and which arises depending on another field.

Selection of document labels: how a document is recorded by regulation, class and the annex information under which it was carried out determines whether that document can later be linked to the device.

Matching of document business rules: under the MDR, Article 66 of the Guide provides different document business rules from Annex 88 to Annex 93 depending on the class. Which annex applies depends on the class and type of the device.

Splitting of the application: the decision on how many separate applications your portfolio will be split into is ours; the rules for this are in a separate section below.

Three actions that remain with the company

There are three actions that cannot be transferred. They are not outside the service; they remain with you because the legislation does not permit anyone else to do them.

  • E-signing of the application: under Article 39(13) of the Guide, an application in "Awaiting Signature" status is signed electronically by the company's authorised applicant signatory. On the device side, sub-item (g) of paragraph 5 of Article 40 provides the same step.
  • Payment: for applications subject to a fee, payment must be made and made through the correct channel by your company. Under sub-item (a) of paragraph 13 of Article 39 of the Guide, for documents subject to a payment condition, the application does not proceed to review until the fee is paid and approved.
  • Accuracy of data: the fourth paragraph of Article 31 of the Medical Device Sales, Advertising and Promotion Regulation is clear. Responsibility for the accuracy of information about devices recorded in the system lies with the sales centre that makes the product registration. We are obliged to enter the data correctly; you are the party that declares the data itself describes your device correctly.

Three inputs requested from the company

Three inputs are required for the service to start. Without them, the registration screen may open but the application will not progress.

  • Authority: you need to define a user of the "Medical Device Registration Officer" type for us from your UTS company page. Article 39(11) and sub-item (f) of paragraph 5 of Article 40 tie the "Approve" action to this user type. The scope of the authority and how it is defined are described in detail on our Registration Officer Authority page.
  • Acceptable copies of documents: for certificates of foreign manufacturers held by importer companies, Article 8(1) of the Guide sets out the accepted routes, and for declarations of conformity Article 12(1) does so: apostille approval, Turkish embassy or consulate approval in the manufacturer's country, the original of an e-Apostille document, or the original of an e-signed document. Where a certificate can be verified on all of its pages on the notified body's query site or in EUDAMED, a copy certified by a Turkish notary is also accepted if the document is not e-signed.
  • Availability of the signatory: under paragraph 6 of Article 5 of the Guide, in company transfers and mergers, the signatories and users defined in UTS must be updated for UTS activities to continue. If the signatory has left or the title has changed, this record must be corrected before registration work begins.

Limit of delegation: the e-signature stays with the company

Some proposals suggest that the e-signature be delegated to the consultant. We do not accept this, and the legal basis for it is clear.

Article 39 of the Guide divides the authority into two separate steps. Paragraph 11 gives the "Approve" action to the registration officer; paragraph 13 leaves the signature to the company's applicant signatory. The registration officer authority extends up to the signature and does not include it.

For domestic manufacturer documents, the system also applies this distinction technically. Under sub-item (ç) of paragraph 1 of Article 13 of the Guide, sub-item 1, UTS permits a document application for a declaration of conformity only when it has been electronically signed by the person registered in the company as "Responsible Director" or "Signatory Authority".

There is one more check. Sub-item (a) of paragraph 2 of Article 9 and sub-item (ç) of paragraph 1 of Article 13 of the Guide, sub-item 2, require that the name and surname of the authorised person written on the document match the name and surname of the person who electronically signed the document. Where one person prepares the document and another signs it, the application stops at this point.

The application is not evaluated until it reaches "Under Review"

This is where companies lose the most time. The record appears on screen, the application number has been generated, and the file is believed to have "gone". However, paragraph 14 of Article 39 of the Guide cuts through this in one sentence: applications that do not reach "Under Review" status cannot be evaluated by the Authority's review expert.

Before an application reaches "Under Review", it passes two thresholds. Under paragraph 12 of Article 39 of the Guide, if there is no breach of procedure or business rules, the application is created in "Awaiting Signature" status. Under paragraph 13 it is signed; if a fee applies, it moves to review after payment.

An application that is unsigned or unpaid does not wait in a queue; it does not wait anywhere. The first thing we follow up is the status in which the file is stuck.

Paid and free applications

The amount of the fee is not the subject of this page, but knowing which application includes a payment step is important for planning. Paragraph 13 of Article 39 of the Guide divides document applications into two groups.

  • Applications with a payment step: applications containing document types mentioned in Articles 6, 7, 10, 11 and 14 of the Guide, namely EC Certificates, EU Certificates, Declarations of Conformity, EU Declarations of Conformity and SIP Declarations, move to "Payment Pending" status after signature. They move to "Under Review" once the fee is paid and approved.
  • Applications going directly to review: document types outside these, for example instructions for use, intended use form, ISO 13485 quality management certificate, Domestic Goods Certificate and Authorised Distributorship Certificate, move to "Under Review" the moment the application is electronically signed.

There is no distinction on the device side. Sub-item (g) of paragraph 5 of Article 40 of the Guide states that after signature a device application moves to "Payment Pending" status and moves to review when the fee is paid.

Splitting the product portfolio into applications

A portfolio of fifty products does not fit into a single application; and where it could fit, it should not. The splitting of applications depends both on number limits and grouping rules, and this work forms a large part of the planning.

  • Document application limit: under paragraph 15 of Article 39 of the Guide, a document application contains at most 5 document notifications.
  • Device application limit: under sub-item (ğ) of paragraph 5 of Article 40 of the Guide, applications for optical products, active implantable medical devices, class 3 products, other products and products under 2023/KK-1 and 2023/KK-2 contain at most 500 device notifications. Under sub-item (d) of paragraph 6, for applications for made-to-measure medical devices and system or procedure packs, the limit is 5.
  • Old-regulation grouping: under paragraph 7 of Article 40 of the Guide, in applications under the old medical device regulations, only devices linked to the same GMDN code may be included together.
  • New-regulation grouping: under paragraph 8, in applications under the new medical device regulations, except for made-to-measure devices, only devices linked to the same Basic UDI-DI code may be included together.
  • Single declaration rule: under sub-item (c) of paragraph 5, only one declaration of conformity may be linked to a device application.

When these four rules work together, a portfolio that appears as one on paper often splits into several applications. We draw the splitting plan before opening the applications; splitting afterwards means withdrawing applications that have already been opened.

The starting point for companies with no UTS record

If you have no UTS record at all, the first link is company registration, and this has a precondition. Under paragraph 5 of Article 5 of the Guide, companies that will register as "Manufacturer/Importer/Distributor/Exporter" in UTS must hold a medical device sales centre licence, and the ÇKYS number must be entered mandatorily during company registration.

The company type also determines which documents are required. Under paragraph 3 of Article 5 of the Guide, if the company type "Company with MERSİS registration" or "Sole proprietorship company not registered with MERSİS" is selected, no physical documents are needed in the application. If the company type is "Joint venture company", a separate company registration application must be made through EBS, and the originals or notarised copies of the joint venture agreement and signature circulars must be sent to the Authority.

For newly established companies, the order is generally as follows: sales centre licence and ÇKYS, then company registration, then user and signatory definitions, then document, and finally device. If you want us to take on the whole of this sequence, our page on UTS setup for newly established medical companies describes this package.

Four errors most often made in in-house applications

Running the registration in-house is possible and is the right choice for some companies. The four points below are the errors we most often correct when we take over files from companies that have registered themselves.

  • Trying a document registration when the notified body is not defined in UTS: under paragraph 7 of Article 6 and paragraph 7 of Article 7 of the Guide, if the notified body that issued the certificate is not defined in UTS, a request is made before document registration to add the body or to define its authority under the relevant legislation, using the "Submit Request" screen.
  • Uploading the full document to the "Turkish Document" field: under sub-item (a) of paragraph 2 of Article 8 of the Guide, only the Turkish section of the document approved by the sworn translator is uploaded to this field.
  • Uploading the printout of an e-Apostilled or e-signed document: the third sub-items of sub-items (c) and (ç) of paragraph 1 of Article 8 of the Guide state that documents whose e-signature cannot be verified because the original was not uploaded are not accepted. What can be verified is the file itself, digitally issued by the relevant authority or notified body.
  • Opening the registration with a parcel barcode: sub-item (b)'s sixth sub-item of paragraph 2 of Article 25 and the same provision of Article 27 state that device registration is made with the barcode of the smallest package placed on the market. Multi-packaging barcodes are added to the "Market Placement Information" field after the registration is completed.

Types of companies served

The service is open to every structure that counts as a "company" in UTS; however, the workload and file type vary between parties. Under the definition in Article 4 of the Guide, an importer is a natural or legal person established in Türkiye who places a device on the Turkish market from another country. A company bringing devices from abroad falls within this definition.

The company definition in the same article is broader still: medical device sales centres, manufacturers, importers, distributors, exporters, optical establishments, hearing device application centres, made-to-measure orthosis and prosthesis application centres, pharmacies and pharmacy warehouses are all included.

  • Importer and distributor companies: the weight lies in the document chain and barcode consistency.
  • Authorised representatives of foreign manufacturers in Türkiye: documentation of the EU authorised representative relationship and declaration registration come to the fore.
  • Newly established medical companies: the chain starts from company registration; the licence and ÇKYS step cannot be skipped.
  • Optical, hearing device and orthosis-prosthesis centres: the registration obligation is the same; the product group and application type differ.

Obligations after registration

When your device reaches "Registered" status, the file does not close. The legislation imposes obligations after registration too, and some of these remain with you.

Under paragraph 4 of Article 31 of the Medical Device Regulation, economic operators update the data within one week of any change to the registration information. Under paragraph 5 of the same article, the accuracy of the data is confirmed within one year of the first submission and every two years thereafter. These are the periods the legislation gives the parties and periodic obligations; they are not a commitment on how long any work will take.

There is also an obligation on records with the same barcode. Under paragraph 3 of Article 43 of the Guide, a data change request is submitted for opinion to other companies with records under the same barcode, and those companies have 5 days to state their opinion. A company that does not state an opinion within that period is deemed to have accepted the request. This means that if you stay silent on a request opened by someone else, your record may change.

Certificates are also monitored after registration. Under paragraph 18 of Article 39 of the Guide, where an application containing an EC Certificate or EU Certificate concludes positively, the validity and currency of the certificates that reach registered status are checked by the Authority. Certificates found not to be current are subject to a 45-day revision process; for EU certificates under the MDR and IVDR revised solely because of an extension of product scope, a 120-day extension process applies instead of 45 days. These periods are the correction periods the legislation grants to the company.

Six questions to ask when choosing a consultant

You may read this page and decide to work with another firm; that is fine. The six questions below protect the health of your record, whoever you work with.

  • Which screen will they open, and with which user type? If they do not know the phrase "Medical Device Registration Officer" in paragraph 11 of Article 39 of the Guide, they do not know what authority you are handing over.
  • How will they label your document, with which triple of class, regulation and annex? Articles 63 to 67 of the Guide separate document business rules by framework and class, from Annex 81 to Annex 100. A document labelled incorrectly cannot later be linked to the device.
  • What happens if a rejection arrives? Paragraph 16 of Article 39 of the Guide provides that for a negative decision on a document application, re-evaluation may be requested through the "Submit Request" screen before reapplying; paragraph 9 of Article 40 provides the same route for device applications. The request must refer to the regulation relevant to the matter being contested.
  • What happens if the same barcode produces another record? Article 43(1) of the Guide provides that, where there are data differences between company records registered with the same barcode, the relevant data fields must be harmonised before the first device application.
  • Who will sign the e-signature? In practice this is the question that most quickly shows the working model of a consultant. A structure that asks for the e-signature to be given to it also blurs the line of responsibility the legislation sets.
  • Do they give a time or outcome guarantee? The Guide does not define in any of its articles how long an application will take to conclude. The periods in the source, such as 45 days, 120 days, 5 days and 3 days, are periods for work the parties must do; they are not a completion schedule. A proposal that gives a timeline commitment is a commitment without a source.

Related service pages

This page describes the backbone of the service; the details are split into topic headings. The links below take you directly to the relevant page depending on the question you came with.

  • Whole importer file: if you want to hand over the entire company, document and product record end to end, see our Medical Device UTS Registration Consultancy page.
  • Device application only: if your documents are ready and the workload is on the product side, see our UTS Product Registration Consultancy page.
  • Document side only: for opening certificate and declaration records with the correct label, see our UTS Document Registration Consultancy page.
  • Authority definition: for how the user to be opened for us is defined and what it covers, see our UTS Registration Officer Authority page.
  • Rejection and objection: if you have a negatively concluded application, see our Correction of Rejected UTS Applications page.
  • Reimbursement preparation: if your record needs to be prepared for the SGK side, see our SUT Code and Barcode Matching page.
  • Borderline product decision: if it is unclear whether your product is a medical device or a cosmetic, see our Cosmetic Product UTS Registration and Borderline Product Consultancy page.

Medical Device ÜTS Registration Consultancy

Request an ÜTS registration consultancy quote

Ehlibeyt Mahallesi, Tekstilciler Caddesi No: 35/7 06520 Çankaya / Ankara - TÜRKİYE

Cevizli Mahallesi, Zuhal Caddesi Ritim İstanbul B Blok, No:44 Maltepe / İstanbul - TÜRKİYE

info@medexmedikal.com
+90 505 580 4622
+90 312 389 1354

ÜTS Guides · Legislation Calendar · Glossary · ÜTS Guide Index · Frequently Asked Questions

Services: ÜTS Consultancy · Who Carries Out the ÜTS Registration? · ÜTS Document Registration Consultancy · ÜTS Product Registration Consultancy · Importer ÜTS Registration Consultancy · Sales Centre Authorisation Certificate · EUDAMED Registration Consultancy · MDR/IVDR Declaration of Conformity · Technical File Preliminary Review · Label and Instructions for Use Check · PRRC Service · PMS and PSUR · Clinical Evaluation · EMDN and GMDN Code Determination · Certificate of Free Sale · EUDAMED XML Generator · ÜTS Registration Training · Correction of a Rejected ÜTS Application

KVKK and Privacy Policy | Cookie Policy | Accessibility Statement

© 2026 Medex Kurumsal Danışmanlık Ltd. Şti.

bottom of page
WhatsApp Hemen Ara