An MDR transition period extension is not a single application. First, an application is made to the Authority through EBS.

MDR Transition Period Extension Application

MDR Transition Period Extension Application: EBS and ÜTS Steps Carried Out Together

An MDR transition period extension is not a single application. First, an application is made to the Authority through EBS. If it is found suitable, the document and/or device registration application is then made in ÜTS. A firm that skips the second step cannot keep its device registered in ÜTS, even if it has received permission from EBS.

This page explains the order in which the two stages proceed, the final date that applies to each device, the documents to request from the manufacturer, and the rules that lead directly to a negative outcome. All dates and article numbers are taken from Articles 45, 46 and 47 of the Guide on the Registration Processes in the Medical Devices Tracking System.

The extension is a two-stage process, not a single application

Paragraph 7 of Article 45 of the Guide states the order clearly: for the devices covered by paragraphs 3 to 6 of this article to benefit from the MDR transition provisions, firms must first apply through EBS under Article 46. Then, if the Authority finds the EBS application suitable, the firm must make the medical device and/or document registration/update applications in ÜTS for the relevant devices and linked documents under Article 47.

Article 47 repeats this requirement several times. Under its third paragraph, subparagraph (a), before a registration/update application can be made in ÜTS for the EC certificate to be given a MDR transition period, an application under Article 46 must first be made in EBS for that certificate, and the Authority must have granted the extension. The last sentence of the same subparagraph draws the conclusion: if no application is made in EBS and the Authority does not grant the extension, the document registration/update application made under this article is rejected.

The same rule is repeated for custom-made devices under the second paragraph, subparagraph (a), and for upgraded Class I devices under the declaration of conformity under the fourth paragraph, subparagraph (a). In all three places the same sentence appears: if there is no EBS permission, the ÜTS application is rejected.

The source of the framework is also written in the Guide. Paragraph 1 of Article 45 states that EU Regulation (EU) 2023/607 entered into force on 20 March 2023 with its publication in the EU Official Journal. Paragraph 2 states that the parallel amendments to the regulation were published in the Official Gazette dated 2 April 2023 and numbered 32151.

Determining the final date for the device

Article 45 of the Guide defines four groups of dates. In each group, the phrase "provided that the conditions set out in the Regulation are met" applies, so the dates depend on conditions and are not automatic.26.05.2026: under paragraph 3, custom-made implantable Class III medical devices under the MDD may be placed on the market or put into service until this date.31.12.2027: under paragraph 4, Class III devices under the MDD or AIMDD, and Class IIb implantable devices, with certain exceptions.31.12.2028: under paragraph 5, Class IIb devices under the MDD not covered by paragraph 4, and Class IIa, Class Im and Class Is devices.31.12.2028, for upgraded devices: under paragraph 6, devices for which the MDD conformity assessment procedure did not require a notified body, for which a declaration of conformity was issued before 26 May 2021, and for which the MDR requires notified body involvement. These are Class I Other devices under the MDD that were upgraded under the MDR.

When we open a file, the first thing we do is determine which of these four paragraphs the device falls under. This directly determines which document set we collect under Article 46 and which ÜTS flow we run under Article 47.

Implants excluded from 31.12.2027

Paragraph 4 contains an exception list for Class IIb implantable devices. Sutures, staples, dental fillings, dental brackets, dental crowns, screws, wedges, plates, wires, pins, clips and connectors are excluded from the scope of this paragraph.

Because these items are removed from the 31.12.2027 line in paragraph 4, they fall into the 31.12.2028 group in paragraph 5. For orthopaedic and dental firms with screws, plates or sutures in their portfolio, this distinction changes the whole plan.

Devices that cannot be extended

Paragraph 3(a) of Article 46 sets a limit. No extension applies to devices covered by an EC certificate issued under the MDD or AIMDD by an authorised notified body, where the certificate expiry date is before 26.05.2021.

This provision is unconditional. Having applied or signed a contract does not change the result. For firms in this situation, the issue is not the extension file but the MDR conformity assessment process itself. The Guide does not define an alternative route under Article 46 for these devices.

Subparagraphs (b), (c), (ç) and (d) of paragraph 3 divide the certificates valid from 26.05.2021 onwards into two groups: those whose expiry date is before 20.03.2023, and those expiring on or after 20.03.2023.

Two-step extension: 26.05.2024 and 26.09.2024

The extension does not go to the longest date in a single step. The system has two levels: first an application to the notified body, then a written contract with the notified body. Each level has its own date and its own extension result.

Application level. Under paragraph 2 of Article 46, provided that an application is made to a notified body designated under the MDR before 26.05.2024, the period during which the relevant devices may remain registered in ÜTS is extended to 26.09.2024, if the application is found suitable after the confirmation procedures. Subparagraph (ç) of paragraph 3 sets the same condition for EC certificates whose expiry date is 20.03.2023 or later, and under subparagraph (f) the result is again 26.09.2024.

Contract level. Subparagraph (d) of paragraph 3 defines the file of manufacturers who applied to a notified body before 26.05.2024 and signed a contract with that body before 26.09.2024. Under subparagraph (g), if the application is found suitable, the validity date of the EC certificate is extended to 31.12.2027 or 31.12.2028, depending on the risk class of the device. The same result is repeated in subparagraph (e) for applications under subparagraphs (b) and (c) of paragraph 3.

Upgraded Class I devices. Subparagraph (a) of paragraph 4 regulates the application case before 26.05.2024; under subparagraph (c) the result is 26.09.2024. Subparagraph (b) regulates the contract case before 26.09.2024; under subparagraph (ç) the period is extended to 31.12.2028.

In short: if there is only an application, the date is 26.09.2024. If there is also a contract, the date is 31.12.2027 or 31.12.2028, depending on the risk class. For this reason, what the manufacturer's document proves determines the length of the extension.

If the contract was signed after the certificate expiry date

Subparagraph (c) of paragraph 3 of Article 46 addresses a special case. For devices covered by an EC certificate issued under the MDD or AIMDD, valid from 26.05.2021 and expiring before 20.03.2023, if the manufacturer signed a contract with a notified body designated under the MDR after the certificate expiry date, the file is different.

In this case, in addition to the manufacturer's declaration and the notified body's confirmation letter, the applicant firm submits a third document: either the permission document received from the Authority under Article 59, paragraph 1 of the MDR, or the document issued under Article 94, paragraph 1 of the MDR, which asks the manufacturer to carry out the applicable conformity assessment procedure within the period stated.

Subparagraph (b) of the same paragraph covers the case where the application was made and the contract signed before the certificate expiry date. In that case the third document requested is a surveillance responsibility document. The difference is whether the contract was signed before or after the certificate expired.

Documents to request from the foreign manufacturer

The content of the EBS file comes from the manufacturer. Our job is to request the right document with the right content, and to check the document received against the minimum requirements of the Guide.

Manufacturer's Declaration: paragraph 5 of Article 46 lists the minimum content of the declaration the manufacturer prepares, confirming that the extension conditions are met.OK Acceptance Document or OK Confirmation Letter: paragraph 7 sets the minimum content of the OK Acceptance Document, and paragraph 6 that of the OK Confirmation Letter. Which one is needed depends on which paragraph and subparagraph of Article 46 the application falls under.

Surveillance responsibility document: the third sub-subparagraphs of subparagraphs (b), (ç) and (d) of paragraph 3 require a document confirming that surveillance responsibility for the devices under the EC certificate has been taken over until 26.09.2024. It is issued by the notified body that issued the current EC certificate, or by the MDR notified body with which the contract is signed, if that body takes over this responsibility.

The document for which the extension is requested: under paragraph 13, the ITC Declaration, where one exists, must be added to the file for applications under paragraph 2, and the Declaration of Conformity covering the devices must be added for applications under paragraph 4.

Paragraph 14 adds a further precondition: the most current version of the EC certificate or Declaration of Conformity for which the extension is requested should, as a rule, already be registered in ÜTS before the application. If it is not registered, the most current version of the document is added to the file, with a sworn translator's certified translation where required.

Difference between the OK Acceptance Document and the OK Confirmation Letter

The two documents look similar, but they prove different things and lead to different extension results.

The OK Acceptance Document proves the application. Under subparagraph (a) of paragraph 7 of Article 46, this document states that the manufacturer's conformity assessment application has been received and accepted by the notified body under point 4.3, first subparagraph, of MDR Annex VII. It includes the application date, the manufacturer's details and the acceptance date. Subparagraph (b) requires the devices that will benefit from the extension to be listed clearly and descriptively, leaving no room for doubt.

The OK Confirmation Letter proves the contract. Subparagraph (b) of paragraph 6 requires a statement that, after the application, a written agreement has been signed between the manufacturer and the notified body under point 4.3, second subparagraph, of MDR Annex VII. The manufacturer's details and, where applicable, the agreement date must also be included. Subparagraph (c) requests a list of the devices covered by the agreement, and subparagraph (ç) requests, for the devices in paragraphs 4 and 5 of Article 45, the EC certificate details covered by the agreement, including the certificate number.

Paragraph 15 closes a common error. Submitting the agreement text and/or audit plans with the application in place of the document referred to in paragraph 6 is not accepted. The contract itself is not evidence. The evidence is the confirmation letter issued by the notified body.

Dates committed to in the manufacturer's declaration

Paragraph 5 of Article 46 lists the minimum content of the Manufacturer's Declaration in six subparagraphs. The first three cover conformity status, and the next three cover dates and contact details.

Conformity status: (a) a statement that the device continues to conform to the AIMDD or MDD, as applicable; (b) a statement that there has been no significant change in design or intended purpose; (c) a statement that the device does not pose an unacceptable risk to the health or safety of patients, users or other persons, or to public health.

Quality management system: (ç) a statement that a quality management system under Article 10(9) of the MDR will be, or has been, put in place no later than 26.05.2024.

Formal application to the notified body: (d) a statement that the manufacturer or its authorised representative has made, or will make, a formal application to a notified body under point 4.3, first subparagraph, of MDR Annex VII for the conformity assessment of the device, or of the device intended to replace it, no later than 26.05.2024. The same subparagraph requires the declaration to include the notified body's four-digit identification number, the EC certificate number covered by the application, and the devices covered by the application.

Written agreement: (e) a statement that a written agreement under point 4.3, second subparagraph, of MDR Annex VII has been, or will be, signed between the notified body and the manufacturer, no later than 26.09.2024. Details such as the EC certificate number covered by the agreement, the devices covered by the agreement and, where the MDD EC certificate validity date is before 20.03.2023, the agreement date must also appear in the declaration.

Matching the wording of the declaration exactly to these subparagraphs is the most technical part of the file. Paragraph 20 notes that if the documents referred to in paragraphs 5, 6 and 7 are in the templates published by the European Commission, the evaluation process will be faster.

The Authority's confirmation email

In this file, the Authority verifies the documents you submit at source. That is why the contact details are functional fields, not decorative ones.

Subparagraph (f) of paragraph 5 of Article 46 requires the contact details, including the email address, of the manufacturer's company official who issued the declaration, so that the validity of the declaration can be confirmed. Subparagraph (d) of paragraph 6 and subparagraph (ç) of paragraph 7 ask for the same details of the notified body official, and provide a fallback: if this information is not available, the confirmation email is sent to the email address defined for the notified body in NANDO. Paragraph 9 requires the manufacturer's confirmation email details to be complete in the manufacturer's declaration and/or petition. Paragraph 8 states that if the firm's email address is given in the petition, that address will also be copied on the confirmation emails.

Paragraph 17 sets the consequence. If the evidence documents are not confirmed by the manufacturer or the notified body, or if the relevant party reports that the document is not current and/or valid, the application results negatively. For this reason, we ask you to inform the manufacturer and the notified body in advance about the upcoming confirmation email.

What we do in ÜTS after EBS approvalA positive answer from EBS does not finish the file; it starts the second stage. Paragraph 3 of Article 47 of the Guide sets out the EC certificate flow step by step.

Opening the field: under subparagraph (b), if "90/385/EEC" or "93/42/EEC" is selected in the "Applicable Regulation" field of the "Update Document" screen in ÜTS, the field "Is this a document registration/update notification under Announcement 2023/KK-1?" appears. If neither regulation is selected, the field does not open.

Selecting "Yes": under subparagraph (c), this field must be set to "Yes". Once selected, the mandatory document field "Evidence Documents for MDR Transition Period Extension" opens.

Evidence documents: under subparagraph (ç), a single file containing the Confirmation Letter stating that the Authority has permitted the extension, together with all the declarations and documents requested in the Article 46 application, must be uploaded complete and with all pages. Paragraph 2(ç) sets the same requirement for the custom-made device flow.

End date: under subparagraph (e), the original expiry date of the certificate is entered in the "Document Expiry Date" field. If the application is found suitable, under subparagraph (ğ) the certificate is set to "Registered" status, and this date is updated to the date stated in the Confirmation Letter that the Authority gives to the firm.

Application type: under subparagraph (g), once the notification is created, the application is made under Article 39 by selecting "Document Application under Announcement 2023/KK-1" as the "Application Type". This type is among those listed in subparagraph (ç) of paragraph 4 of Article 39.

Paragraph 4 sets the same flow for the declaration of conformity of upgraded Class I devices. There, selecting "93/42/EEC" in the "Applicable Regulation" field opens the field. If the declaration is "Limited Duration", the original expiry date is entered; if it is "Unlimited Duration", no date is entered.

If the Declaration of Conformity does not stay "Registered"The extension is granted to the EC certificate, but the declaration of conformity linked to the certificate must also remain "Registered" in ÜTS. Subparagraph (h) of paragraph 3 of Article 47 distinguishes two cases.

If the declaration is "Limited Duration", meaning it has an expiry date and is already recorded in ÜTS, then under the first sub-subparagraph of (h), without creating a document registration/update application, the firm uses the "Submit Request" screen and creates a request by selecting "MDR/IVDR Extension" as the "Request Field". The second sub-subparagraph requires the ÜTS Document Number of the declaration to be entered in this request, and states that the firm is responsible for any erroneous transactions or delays arising from failing to enter it.

If the declaration is "Limited Duration" but has no record at all in ÜTS, the flow changes. Under the first sub-subparagraph of (ı), the firm selects "Yes" to "Is it unlimited duration?" on the "Document Registration/Update" screen and applies without entering an expiry date. Under the second sub-subparagraph, a request is then created from the "Submit Request" screen by selecting "MDR/IVDR Extension", so that the application is evaluated under "Announcement 2024/KK-3", and the Document Application Number must be entered in this request.

For "Unlimited Duration" declarations, these steps are not carried out under the fourth sub-subparagraphs of (h) and (ı). If such a declaration is not "Registered" in ÜTS, a normal document registration/update application is made under Articles 12 or 13 and Article 39 of the Guide. Paragraph 19 of Article 46 also requires that ÜTS requests related to these processes be created by selecting the "MDR/IVDR Extension" request field, with the process tracking number of the EBS application attached to the request.

Translation and approval: documents required in this file

Document approval works differently on the EBS and ÜTS sides, and the difference matters for cost.EBS side. Under paragraph 12 of Article 46, for applications under this article, the original document submitted to the Authority, together with sworn translator-certified Turkish translations of all documents in a foreign language, must be attached to the application file.ÜTS side. Subparagraph (d) of paragraph 2 and subparagraph (d) of paragraph 3 of Article 47 state that apostille or notary approval is not required for evidence documents. However, the Turkish translations of documents originally in a foreign language must be certified by a sworn translator. Subparagraph (d) of paragraph 4 repeats the same rule.

Physical submission. Subparagraph (f) of paragraph 2 of Article 47, and subparagraph (g) of paragraphs 3 and 4, state that the documents uploaded in the application do not need to be sent to the Authority physically; registering the application through ÜTS is sufficient. Article 46 also states that the EBS application is made without physical paper documents.

Rules that lead directly to a negative outcome

Article 46 contains several rules that allow the file to be rejected without its content being assessed. We check each of them one by one before submission.

One document per application: under paragraph 18, a firm making an application under this article may request a transition period for only one document. If the application petition asks for more than one document to be evaluated, the application is not taken into evaluation and results negatively.

Application without a petition: under paragraph 8, applications made to the Authority under this article without a petition are not accepted. The same paragraph requires the petition to state the document for which the transition period is requested and, where applicable, the devices excluded from the scope of the document.

Inconsistency between documents: under paragraph 10, there must be no inconsistency between the evidence documents submitted to the Authority. Under paragraph 11, if there is an inconsistency in the manufacturer details between the evidence documents and the document for which the transition period is requested, additional evidence documents that remove the inconsistency must also be added to the file.

Wrong or missing document: under paragraph 16, the application results negatively if it is made contrary to the provisions of the article, if evidence documents are added incomplete or incorrect, or if documents other than those requested are added.

Scope of service and its limits

Our output covers both stages. On the EBS side: determining which paragraph of Article 45 the device falls under, determining which subparagraph of Article 46 applies based on the certificate expiry date, requesting from the manufacturer the declaration and notified body documents according to their minimum requirements, checking the documents received against paragraphs 5, 6 and 7, preparing the sworn translation file, and writing the petition in line with the one-document rule. On the ÜTS side: combining the Confirmation Letter and its annexes into a single file, creating the application with the "Document Application under Announcement 2023/KK-1" type, and selecting the correct flow for limited and unlimited duration declarations.

What we cannot do is equally clear. The notified body application and the contract are made by the manufacturer; these are conditions that have passed and cannot be produced after the fact. The Manufacturer's Declaration is issued by the manufacturer, and the Acceptance Document and Confirmation Letter are issued by the notified body. A consultant cannot prepare these documents. No one can guarantee the outcome of the application either: paragraph 17 clearly states that a document that is not confirmed results in a negative application.

Our working method keeps responsibility shared. The firm grants the consultant user authority from its own ÜTS company page, the consultant creates the document and device records with the "Medical Device Registration Officer" authority, and the official who signs the application remains the firm's signatory. The accuracy of the information submitted in EBS, and the match between the data entered in ÜTS and the document, are the responsibility of the applicant firm. We take on the preparation, the article-by-article comparison and the registration process.

Medical Device ÜTS Registration Consultancy

Request an ÜTS registration consultancy quote

Ehlibeyt Mahallesi, Tekstilciler Caddesi No: 35/7 06520 Çankaya / Ankara - TÜRKİYE

Cevizli Mahallesi, Zuhal Caddesi Ritim İstanbul B Blok, No:44 Maltepe / İstanbul - TÜRKİYE

info@medexmedikal.com
+90 505 580 4622
+90 312 389 1354

ÜTS Guides · Legislation Calendar · Glossary · ÜTS Guide Index · Frequently Asked Questions

Services: ÜTS Consultancy · Who Carries Out the ÜTS Registration? · ÜTS Document Registration Consultancy · ÜTS Product Registration Consultancy · Importer ÜTS Registration Consultancy · Sales Centre Authorisation Certificate · EUDAMED Registration Consultancy · MDR/IVDR Declaration of Conformity · Technical File Preliminary Review · Label and Instructions for Use Check · PRRC Service · PMS and PSUR · Clinical Evaluation · EMDN and GMDN Code Determination · Certificate of Free Sale · EUDAMED XML Generator · ÜTS Registration Training · Correction of a Rejected ÜTS Application

KVKK and Privacy Policy | Cookie Policy | Accessibility Statement

© 2026 Medex Kurumsal Danışmanlık Ltd. Şti.

bottom of page
WhatsApp Hemen Ara